This project will improve the I-64/I-464 interchange by providing a direct connection between I-64 eastbound and Route 168 southbound via I-464 southbound.
This project consists of work associated with Monongahela River Locks and Dam no. 3 (also called Elizabeth Locks and Dams) demolition, establishment of the new navigable channel and stabilization of the monoliths to remain after construction.
This project transformed Coliseum Lake into a stormwater treatment facility for a 362-acre watershed.
The Ft. Eustis Bridge, the entrance to Joint Base Langley-Eustis, was widened during its reconstruction to provide better access.
The project consists of constructing a new 303-ft long x 74-ft wide, four-lane structural steel girder bridge over Route 7, and realigning portions of the roadway from Russell Branch Parkway on the west end of the project to Research Place to the east end of the project.
This project extended the Martin Luther King Expressway to provide a shorter, more direct route to the Downtown Tunnel from Portsmouth.
This project involved the construction of a new major arterial connector across sensitive wetlands to relieve traffic congestion and widen outside travel lanes.
This design-build project replaced the structurally deficient Darden Memorial Bridge on Meherrin Road (Route 35).